Skip to:ContentBottom
Cover image for The future Watana reservoir fish community and risk of entrainment study, Study plan Section 9.10, Final study plan
The future Watana reservoir fish community and risk of entrainment study, Study plan Section 9.10, Final study plan
Title:
The future Watana reservoir fish community and risk of entrainment study, Study plan Section 9.10, Final study plan
JLCTITLE245:
Alaska Energy Authority.
Corporate Author:
Uniform Title:
Final study plan. Study plan Section 9.10, The future Watana reservoir fish community and risk of entrainment study
Publication Information:
[Anchorage] : [Alaska Energy Authority], [2013]
Physical Description:
14 p. : 1 col. map ; 28 cm.
General Note:
"July 2013."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 200.
Abstract:
Construction of the Susitna-Watana Hydroelectric Project (with the building the Watana Dam) will fundamentally change the fish habitat characteristics in the inundation area. The overarching goal of this study is to predict the fish community that will develop in the Project reservoir based on the existing species and the habitat that will be created in the inundation zone, and to characterize the potential loss from entrainment.
Bibliography Note:
Includes bibliographical references (p. 9.10-10 to 9.10-11).
Geographic Term:
Added Corporate Author:
Type of Report:
Final study plan.
Citation Reference Notes:
Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Running title: Final study plan. The future Watana reservoir fish community and risk of entrainment study 9.10
Go to:Top of Page