Skip to:ContentBottom
Cover image for Air quality study, Study plan Section 15.9, Initial Study Report
Air quality study, Study plan Section 15.9, Initial Study Report
Title:
Air quality study, Study plan Section 15.9, Initial Study Report
JLCTITLE245:
prepared for Alaska Energy Authority ; prepared by HMMH.
Uniform Title:
Initial Study Report. Study plan Section 15.9, Air quality study. Draft.
Edition:
Draft.
Publication Information:
[Anchorage : Alaska Energy Authority, 2014]
Physical Description:
vi, 25 p. : col. maps, col. chart ; 28 cm.
General Note:
"February 2014."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 207.
Abstract:
The purpose of this study is to assess the current conditions of the study area against applicable state and national air quality standards and evaluate the Susitna-Watana Hydroelectric Project's air quality impact against these standards relative to both short-term (construction) and long-term (operational) impacts. The study area includes not only the immediate Project area, but also the Railbelt region.
Bibliography Note:
Includes bibliographical references (p. 13).
Added Corporate Author:
Type of Report:
Draft Initial Study Report.
Citation Reference Notes:
Listed in February 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Draft Initial Study Report.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Running title: Initial Study Report. Air quality study (15.9)
Go to:Top of Page