Cover image for Initial Study Report.
Initial Study Report.
Title:
Initial Study Report.
Edition:
Draft.
Publication Information:
[Anchorage] : [Alaska Energy Authority], [2014]
Physical Description:
58 parts : color illustrations, color maps ; 28 cm.
General Note:
"February 2014."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"Prepared for Alaska Energy Authority."

ARLIS assigned report number: SuWa 207.

The release of this set of study plans was accompanied by a cover letter dated February 3, 2014 addressed to Kimberly D. Bose (Secretary, Federal Energy Regulatory Commission (FERC)) from Wayne Dyok (Project Manager, Alaska Energy Authority). The letter is titled: Susitna-Watana Hydroelectric Project, Project No. 14241-000 ; Filing and distribution of Draft Initial Study Report.

Each of the 58 study plans is cataloged separately.

Each study plan section is prepared by a different consultant: ABR, Inc.-Environmental Research & Services; Ahtna, Inc.; Alaska Cooperative Fish and Wildlife Research Unit; Alaska Department of Fish and Game; Alaska Department of Fish and Game, Division of Sport Fish; Alaska Department of Natural Resources, Division of Geological & Geophysical Surveys; Charles M. Mobley & Associates; DOWL-HKM; ERM; Furgo; Gene Conservation Laboratory (Commercial Fisheries Division, Alaska Department of Fish and Game); Geo-Watershed Scientific; Golder Associates Inc.; Gwanshii; HDR, Inc.; HMMH; LGL Alaska Research Associates, Inc.; MWH [that is perhaps MWH Americas, Inc.]; NewFields; Northern Economics, Inc.; Northern Land Use Research Alaska LLC; Pacific Rim Geological Consulting, Inc.; R2 Resource Consultants, Inc.; Stephen R. Braund & Associates; Tetra Tech, Inc.; University of Alaska Fairbanks; University of Alaska Fairbanks, Institute of Arctic Biology; URS Corporation (URS, Inc.); Veritas Economic Consulting; and Watershed GeoDynamics.
Abstract:
This set of technical documentation represent the draft Initial Study Report (ISR) for the proposed Susitna-Watana Hydroelectric Project. The ISR is required for the original licensing of the proposed project. The constituent studies had been set forth in the FERC-approved Revised study plan, parts of which have been modified by FERC's Study plan determination. These documents describe Alaska Energy Authority's status in implementing the initial studies, which are still ongoing and scheduled to be completed during the 2014 and 2015 study years.
Bibliography Note:
Includes bibliographical references.
Added Title Contained Works:
Susitna-Watana Hydroelectric Project, Project No. 14241-000 ; Filing and distribution of Draft Initial Study Report.
Type of Report:
Draft Initial Study Report.
Citation Reference Notes:
Listed in February 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Draft Initial Study Report.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Contents:
Section 4. Geology and soils characterization study -- Section 5. [Water quality and mercury studies] -- Section 6. [Geomorphology studies] -- Section 7. [Hydrology studies] -- Section 8. [Instream flow studies] -- Section 9. [Fish and aquatic resources studies] -- Section 10. [Wildlife studies] -- Section 11. [Botanical studies] -- Section 12. [Recreational and aesthetic studies] -- Section 13. [Cultural and paleontological studies] -- Section 14. Subsistence resources study -- Section 15. [Socioeconomic, transportation, health, and air studies] -- Section 16. [Natural hazard studies].