Skip to:ContentBottom
Cover image for Comments on Revised Study Plan for Susitna-Watana Hydroelectric Project, FERC Project No. 14241.
Comments on Revised Study Plan for Susitna-Watana Hydroelectric Project, FERC Project No. 14241.
Title:
Comments on Revised Study Plan for Susitna-Watana Hydroelectric Project, FERC Project No. 14241.
Publication Information:
2013 January 17.
Physical Description:
68 pages in various pagings : illustrations (chiefly col.), color maps ; 28 cm.
General Note:
Title from subject line in cover letter.

Letterhead: State of Alaska, Department of Natural Resources, Office of Project Management and Permitting, Anchorage, Alaska.

ARLIS assigned report number: SuWa 296.

This document is a letter with attachments sent on January 17, 2013, to Kimberly D. Bose, Secretary of the Federal Energy Regulatory Commission (FERC), from Tom Crafford, Director of Office of Project Management and Permitting, as a consolidated comment from two Alaska resource agencies on the Initial Study Report (comprising sixty volumes published in 2014 and 2015).

Attachment 2 has its own title page with title: Guidance document for writing a Tier 2 Water Quality Monitoring Quality Assurance Project Plan (QAPP). -- Draft, Rev. 0. -- Alaska Department of Environmental Conservation, Division of Water, June 2012.
Abstract:
This document is the response from the Alaska Department of Environmental Conservation and the Alaska Department of Fish and Game regarding the Initial Study Report (ISR) for the proposed Susitna-Watana Hydroelectric Project (FERC No. 14241). The ISR is required by the Federal Energy Regulatory Commission for the licensing of the proposed project. This document comprises a 2-page cover letter accompanied by comments from the two agencies (14 pages) and two attachments (52 pages). The document was sent by the Alaska Office of Project Management and Permitting along with a cover letter written by that Office, whose role is to facilitate interagency coordination development projects in the state during the permitting processes.
Bibliography Note:
Includes bibliographical references.
Title Subject:
Added Uniform Title:
Evaluation of: Initial Study Report.
Added Uniform Title Contained Work:
Guidance document for writing a Tier 2 Water Quality Monitoring Quality Assurance Project Plan (QAPP). Draft.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Linking Entry Complexity Note:
An evaluation of: Initial Study Report. -- [Anchorage] : [Alaska Energy Authority], [2014-2015] -- June 2014 (but Part D sections and the overview are dated November 2015). -- (Susitna-Watana Hydroelectric Project document ; no. 223).
Contents:
[Cover letter] -- Alaska Department of Environmental Conservation [comments] -- Alaska Department of Fish and Game [comments] -- Attachment 1. ADEC Water Quality Monitoring Quality Assurance Project Plan (QAPP) review checklist for Susitna Hydro Project Baseline WQ Monitoring Sampling and Analysis Plan QAPP -- Attachment 2. ADEC draft guidance for a Tier 2 Water Quality Monitoring QAPP, Rev. 0.
Go to:Top of Page