JLC Corporate Author
Initial Study Report Meetings (2014 October 23 : Anchorage, Alaska)
2014]
The discussion at the October 23 meeting covered current efforts on the studies on recreation resources (Study 12.5), aesthetics (Study 12.6), re
Regular print
[1980]
Describes research in various areas (hydrology, seismicity, design, environment, transmission, etc.) that is being planned for determining the fe
Regular print
[1981]
Describes research in various areas (hydrology, seismicity, design, environment, etc.) that is being planned for determining the feasibility of t
Regular print
[1980]
A review of previous reports on the Susitna Hydroelectric Project covering studies made by the U.S. Bureau of Reclamation (1953 and 1960), Alaska
Electronic resource
[1982]
Acres American is in agreement with Alaska Power Authority to perform studies on the Susitna Hydroelectric Project. This document contains contra
Regular print
[1980]
This document contains the first set of revisions to (but does not replace) the earlier revised draft of the study plan for the Susitna Hydroelec
Regular print
[2012]
The goal of the water quality studies is to assess the effects of the proposed Project on water quality in the Susitna River basin and to identif
Regular print