Skip to:ContentBottom
Cover image for Susitna Hydroelectric Project conceptual alternatives design report
Susitna Hydroelectric Project conceptual alternatives design report
Title:
Susitna Hydroelectric Project conceptual alternatives design report
JLCTITLE245:
prepared by HDR Alaska, Inc. ; prepared for Alaska Energy Authority.
Edition:
[2009 version].
Publication Information:
[Anchorage] : [Alaska Energy Authority], [2009]
Physical Description:
264 p. in various pagings : col. ill ; 28 cm.
General Note:
"November 23, 2009."

ARLIS assigned report number: SuWa 198.

This report is based on a PDF file dated November 2009. This version contains appendices A-D as given on the table of contents. Another version of this report was created in 2010 with identical title page and chapters (with paging altered by the addition of two blank pages), but with only the appendix title pages for the original appendices A-D and with the inclusion of new appendices B-G.
Bibliography Note:
Includes bibliographical references (p. 23-24).
Added Corporate Author:
Type of Report:
Final draft.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Contents:
Executive summary -- Background -- Preliminary energy estimate -- Estimates of probable project development costs -- Project development schedule -- Project development issues -- References -- appendix A. Energy analysis input and results -- appendix B. Detailed cost estimates -- appendix C. Detailed schedules -- appendix D. Climate change analyses.
Go to:Top of Page