Skip to:ContentBottom
Cover image for River productivity study, Study plan Section 9.8, Initial Study Report
River productivity study, Study plan Section 9.8, Initial Study Report
Title:
River productivity study, Study plan Section 9.8, Initial Study Report
JLCTITLE245:
prepared for Alaska Energy Authority ; prepared by R2 Resource Consultants, Inc., Alaska Cooperative Fish and Wildlife Research Unit, University of Alaska Fairbanks.
Uniform Title:
Initial Study Report. Study plan Section 9.8, River productivity study. Draft.
Edition:
Draft.
Publication Information:
[Anchorage] : [Alaska Energy Authority], [2014]
Physical Description:
230 pages in various pagings : color illustrations, color maps, color charts ; 28 cm.
General Note:
"February 2014."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 207.
Abstract:
Operations of the proposed Susitna-Watana Hydroelectric Project would likely affect the abundance and distribution of benthic algae and benthic macroinvertebrate populations, which could ultimately affect fish growth and productivity in the freshwater ecosystem. The chief goal of this study is to collect baseline data to assist in evaluating the effects of Project-induced changes in flow and the interrelated environmental factors (temperature, substrate, water quality) upon the benthic macroinvertebrate and algal communities in the middle and lower Susitna River. This document details Alaska Energy Authority's status in implementing the study by describing the activities that are being performed and whether variances are being made for each study component.
Bibliography Note:
Includes bibliographical references (main volume: pages 33-37).
Added Corporate Author:
Added Title Contained Works:
Review of the effects of hydropower on factors controlling benthic communities.

Site-specific sample collection locations.

Analysis of potentially dewatered river productivity sampling sites in 2013.

Talkeetna site selection consultation documentation.
Type of Report:
Draft Initial Study Report.
Citation Reference Notes:
Listed in February 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Draft Initial Study Report.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Running title: Initial Study Report. River productivity study (9.8)
Contents:
River productivity study -- appendix A. Review of the effects of hydropower on factors controlling benthic communities -- appendix B. Site-specific sample collection locations -- appendix C. Analysis of potentially dewatered river productivity sampling sites in 2013 -- appendix D. Talkeetna site selection consultation documentation.
Go to:Top of Page