Skip to:ContentBottom
Cover image for Phase I, Environmental studies final report. Subtask 7.06, Cultural resources investigation
Phase I, Environmental studies final report. Subtask 7.06, Cultural resources investigation
Title:
Phase I, Environmental studies final report. Subtask 7.06, Cultural resources investigation
JLCTITLE245:
Subtask 7.06, Cultural resources investigation / [prepared by E. James Dixon and others] ; submitted by University of Alaska Musem and Terrestrial Environmental Specialists, Inc. ; to Acres American Incorporated.
Publication Information:
[Anchorage, Alaska] : Alaska Power Authority, [1982]
Physical Description:
837 pages in various pagings : illustrations, maps ; 28 cm.
General Note:
At head of title: Alaska Power Authority, Susitna Hydroelectric Project.

Additional authors from added title page: George S. Smith, Robert C. Betts, Robert M. Thorson.

"April 1982."

Appendix E is confidential information and was bound separately. It was not available to the library for cataloging.
Abstract:
"This document is a final report which presents the results of a preliminary two-year cultural resources program designed to locate, document, evaluate and provide recommendations for mitigating adverse effects on cultural resources within the Susitna Hydroelectric Project area. ... The two-year program was predominantly a reconnaissance level survey aimed at locating and documenting cultural resources in the study area. In addition it was possible to systematically test 18 of 115 known sites."--Page 1-1.
Local Note:
ARLIS: Appendix E is not available in any copy.
Bibliography Note:
Includes bibliographical references (pages 10-1-10-18).
Added Corporate Author:
Citation Reference Notes:
Assigned APA Document no. 1299 in the Susitna Hydroelectric Project document index. Also assigned no. 377 (the paging total under this duplicate entry included only the first half of a copy split into two).
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Alaska Power Authority, Susitna Hydroelectric Project. Phase I, Environmental studies final report. Subtask 7.06, Cultural resources investigation

Portion of title: Environmental studies final report. Subtask 7.06, Cultural resources investigation

Cultural resources investigation. Phase I report

Phase I report

Environmental studies. Subtask 7.06, Cultural resources investigation. Phase I report

Subtask 7.06, Cultural resources investigation. Phase I report

Preliminary cultural resource survey in the upper Susitna River Valley

Cover title: Susitna Hydroelectric Project. Environmental studies. Subtask 7.06, Cultural resources investigation. Phase I report

Added title page title: Final report, Sub-task 7.06, Cultural resources investigation for the Susitna Hydroelectric Project : preliminary cultural resource survey in the upper Susitna River Valley
Contents:
List of artifact photos -- Proposed development -- Introduction -- Methodology -- Historic and archeological sites in the project area located during reconnaissance level testing, 1980 and 1981 -- Systematic testing results and discussion -- Geoarcheology -- Paleontology -- The prehistory and history of the Upper Susitna River region -- Impact on historic and archeological sites -- Mitigation of impact on historic and archaeological sites -- Authorities contacted -- appendix A. Literature review, archeology, ethnology, and history -- appendix B. Literature review, geoarcheology -- appendix C. Forms -- appendix D. Correspondence -- appendix E. Maps of site locations and survey locales.
Go to:Top of Page