Skip to:ContentBottom
Cover image for Study of fish passage feasibility at Watana Dam, Study plan Section 9.11, Initial Study Report
Study of fish passage feasibility at Watana Dam, Study plan Section 9.11, Initial Study Report
Title:
Study of fish passage feasibility at Watana Dam, Study plan Section 9.11, Initial Study Report
JLCTITLE245:
prepared by R2 Resource Consultants, Inc.
Uniform Title:
Initial Study Report. Study plan Section 9.11, Study of fish passage feasibility at Watana Dam.
Publication Information:
[Anchorage] : [Alaska Energy Authority], [2014-2015]
Physical Description:
504 pages in various pagings : color illustrations, color maps, color charts ; 28 cm.
General Note:
"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"Prepared for Alaska Energy Authority."

Parts A, B, and C are dated: June 2014.

Part D is dated: November 2015.

ARLIS assigned report number: SuWa 223.

Appendices A and B do not have appendix title pages. Appendices C and D have appendix title pages with statement: "Prepared by R2 Resource Consultants, Inc. & LGL Alaska Research Associates, Inc."
Abstract:
This study is being conducted to develop a fish passage strategy in support of the license application for the Susitna-Watana Hydroelectric Project. The study will explore various alternatives in support of three basic strategies related to fish passage: (1) the proposed Susitna-Watana Hydroelectric Project without fish passage, (2) integration of upstream and downstream passage features into the current dam design, and (3) the retrofit of upstream and downstream fish passage features to a dam designed without passage.
Bibliography Note:
Includes bibliographical references (Part A: pages 9-11).
Geographic Term:
Added Corporate Author:
Added Title Contained Works:
Detailed study schedule updated July 10, 2013.

Physical, hydrological, and engineering information.
Added Uniform Title:
Succeeded by (expression): Fish passage feasibility at Watana Dam, Study plan Section 9.11, 2014 Study Implementation Report.
Type of Report:
Initial Study Report.
Citation Reference Notes:
Listed on the Susitna-Watana Hydroelectric Project's Document webpage (starting in June 2014 with Parts A-C) under the category: Initial Study Report.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Linking Entry Complexity Note:
Succeeded by: Fish passage feasibility at Watana Dam, Study plan Section 9.11, 2014 Study Implementation Report / prepared by R2 Resource Consultants, Inc. -- October 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289).
Variant Title:
Running title: Initial Study Report. Study of fish passage feasibility at Watana Dam (9.11)
Contents:
Part A. Sections 1-6, 8-10 -- Appendix A. Fish Passage Technical Working Group consultation record -- Appendix B. Biological information -- Appendix C. Physical, hydrological, and engineering information -- Appendix D. Detailed study schedule updated July 10, 2013 -- Part B. Supplemental information (and errata) to Part A (February 3, 2014 Draft Initial Study Report) -- Part C. Executive summary and Section 7 -- Part D. Supplemental information to June 2014 Initial Study Report.
Go to:Top of Page