Skip to:ContentBottom
Cover image for Proposal to eliminate the Chulitna Corridor from further study
Proposal to eliminate the Chulitna Corridor from further study
Title:
Proposal to eliminate the Chulitna Corridor from further study
JLCTITLE245:
prepared by Alaska Energy Authority.
Corporate Author:
Publication Information:
[Anchorage : Alaska Energy Authority, 2014]
Physical Description:
2 p. ; 28 cm.
General Note:
"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"September 2014."

ARLIS assigned report number: SuWa 229.

This document was filed to FERC as Attachment A to: Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Initial filing of September 2014 technical memoranda. (SuWa 228).
Abstract:
The Chulitna Corridor has been one of three access and transmission corridors that the Alaska Energy Authority (AEA) has been evaluating for the Susitna-Watana Hydroelectric Project. This corridor runs north of the Susitna River and extends to the Chulitna rail siding. AEA is reconsidering its corridor options, however, and would like to include a Denali East Option, but eliminate the Chulitna Corridor from further study.
Added Corporate Author:
Type of Report:
September 17, 2014 technical memorandum filings.
Citation Reference Notes:
Listed in September 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: September 17, 2014 technical memorandum filings.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Other Relationship Entry:
Originally submitted as Attachment A to: Dyok, Wayne. Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Initial filing of September 2014 technical memoranda. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 228 SuWa 228
Go to:Top of Page