Skip to:ContentBottom
Cover image for Geology and soils characterization study, Study plan Section 4.5, Final study plan
Geology and soils characterization study, Study plan Section 4.5, Final study plan
Title:
Geology and soils characterization study, Study plan Section 4.5, Final study plan
JLCTITLE245:
Alaska Energy Authority.
Corporate Author:
Uniform Title:
Final study plan. Study plan Section 4.5, Geology and soils characterization study
Publication Information:
[Anchorage] : Alaska Energy Authority, [2013]
Physical Description:
8 p. : 1 col. ill. ; 28 cm.
General Note:
"July 2013."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 200.
Abstract:
The goals of this study are to conduct a geology and soils evaluation to define the existing geological conditions at the dam site, reservoir, and access and transmission corridors, and to develop design criteria to ensure that the proposed Susitna-Watana Hydroelectric Project facilities and structures will be safe and adequate to fulfill their functions.
Bibliography Note:
Includes bibliographical references (page "4.5-7").
Added Corporate Author:
Type of Report:
Final study plan.
Citation Reference Notes:
Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Running title: Final study plan. Geology and soils study 4.5
Go to:Top of Page