Skip to:ContentBottom
Cover image for River productivity study, Study plan Section 9.8, Final study plan
River productivity study, Study plan Section 9.8, Final study plan
Title:
River productivity study, Study plan Section 9.8, Final study plan
JLCTITLE245:
Alaska Energy Authority.
Corporate Author:
Uniform Title:
Final study plan. Study plan Section 9.8, River productivity study
Publication Information:
[Anchorage : Alaska Energy Authority, 2013]
Physical Description:
32 p. : 2 col. maps ; 28 cm.
General Note:
"July 2013."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 200.
Abstract:
Operations of the proposed Susitna-Watana Hydroelectric Project would likely affect the abundance and distribution of benthic algae and benthic macroinvertebrate populations, which could ultimately affect fish growth and productivity in the freshwater ecosystem. The chief goal of this study is to collect baseline data to assist in evaluating the effects of Project-induced changes in flow and the interrelated environmental factors (temperature, substrate, water quality) upon the benthic macroinvertebrate and algal communities in the middle and lower Susitna River. This document gives a general description of the study, its purpose, methods, and its relationship to other studies.
Bibliography Note:
Includes bibliographical references (p. 9.8-20 to 9.8-28).
Added Corporate Author:
Type of Report:
Final study plan.
Citation Reference Notes:
Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Running title: Final study plan. River productivity study 9.8
Go to:Top of Page