Skip to:ContentBottom
Cover image for River productivity study, Study plan Section 9.8, 2014 Study Implementation Report
River productivity study, Study plan Section 9.8, 2014 Study Implementation Report
Title:
River productivity study, Study plan Section 9.8, 2014 Study Implementation Report
JLCTITLE245:
prepared by R2 Resource Consultants, Inc. [and] Alaska Cooperative Fish and Wildlife Research Unit, University of Alaska Fairbanks.
Publication Information:
[Anchorage] : [Alaska Energy Authority], [2015]
Physical Description:
xxvii, 231, 36, 15 pages : illustrations (chiefly col.), 28 color maps ; 28 cm.
General Note:
"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"Prepared for Alaska Energy Authority."

"October 2015."

ARLIS assigned report number: SuWa 289.
Abstract:
This study is being conducted as part of a series of studies to be submitted to the Federal Energy Regulatory Commission for licensing of the Susitna-Watana Hydroelectric Project in Alaska. Operations of the proposed project would likely affect the abundance and distribution of benthic algae and benthic macroinvertebrate populations, which could ultimately affect fish growth and productivity in the freshwater ecosystem. The chief goal of Study 9.8 is to collect baseline data to assist in evaluating the effects of Project-induced changes in flow and the interrelated environmental factors (temperature, substrate, water quality) upon the benthic macroinvertebrate and algal communities in the middle and lower Susitna River. This document details Alaska Energy Authority's status in implementing the study in 2014, during which four field activities were conducted focusing on data collection to support trophic modeling and stable isotope analysis.
Bibliography Note:
Includes bibliographical references (main report: pages 73-82).
Added Corporate Author:
Added Title Contained Works:
Additional tables.

Site-specific sample collection locations.
Added Uniform Title:
Preceded by (expression): River productivity study, Study plan Section 9.8, Initial Study Report.
Type of Report:
November 2015; Study Completion and 2014/2015 Implementation Reports.
Citation Reference Notes:
Listed in December 2015 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: November 2015; Study Completion and 2014/2015 Implementation Reports.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Linking Entry Complexity Note:
Preceded by: River productivity study, Study plan Section 9.8, Initial Study Report / prepared by R2 Resource Consultants, Inc. [and] Alaska Cooperative Fish and Wildlife Research Unit, University of Alaska Fairbanks. -- June 2014 (but Part D is dated November 2015). -- (Susitna-Watana Hydroelectric Project document ; no. 223).
Variant Title:
Running title: Study Implementation Report. River productivity study (Study 9.8)
Contents:
[Main report] -- Appendix A. Additional tables -- Appendix B. Site-specific sample collection locations.
Go to:Top of Page