Cover image for Eulachon run timing, distribution, and spawning in the Susitna River, Study plan Section 9.16, Final study plan
Eulachon run timing, distribution, and spawning in the Susitna River, Study plan Section 9.16, Final study plan
Title:
Eulachon run timing, distribution, and spawning in the Susitna River, Study plan Section 9.16, Final study plan
JLCTITLE245:
Alaska Energy Authority.
Corporate Author:
Uniform Title:
Final study plan. Study plan Section 9.16, Eulachon run timing, distribution, and spawning in the Susitna River
Publication Information:
[Anchorage] : [Alaska Energy Authority], [2013]
Physical Description:
18 p. : 2 col. maps ; 28 cm.
General Note:
"July 2013."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 200.
Abstract:
The goal of the study is to collect baseline information regarding eulachon run timing, distribution, and habitat use in the Susitna River in 2013 and 2014.
Bibliography Note:
Includes bibliographical references (p. 9.16-12 to 9.16-13).
Added Corporate Author:
Type of Report:
Final study plan.
Citation Reference Notes:
Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Running title: Final study plan. Eulachon run timing, distribution, and spawning in the Susitna River 9.16