Eulachon run timing, distribution, and spawning in the Susitna River, Study plan Section 9.16, Final study plan
Title:
Eulachon run timing, distribution, and spawning in the Susitna River, Study plan Section 9.16, Final study plan
JLCTITLE245:
Alaska Energy Authority.
Corporate Author:
Uniform Title:
Final study plan. Study plan Section 9.16, Eulachon run timing, distribution, and spawning in the Susitna River
Publication Information:
[Anchorage] : [Alaska Energy Authority], [2013]
Physical Description:
18 p. : 2 col. maps ; 28 cm.
General Note:
"July 2013."
"Susitna-Watana Hydroelectric Project (FERC No. 14241)."
ARLIS assigned report number: SuWa 200.
Abstract:
The goal of the study is to collect baseline information regarding eulachon run timing, distribution, and habitat use in the Susitna River in 2013 and 2014.
Bibliography Note:
Includes bibliographical references (p. 9.16-12 to 9.16-13).
Added Corporate Author:
Type of Report:
Final study plan.
Citation Reference Notes:
Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Running title: Final study plan. Eulachon run timing, distribution, and spawning in the Susitna River 9.16