Skip to:ContentBottom
Cover image for Susitna Hydroelectric Project. Final report, big game studies. Vol. II, Moose upstream
Susitna Hydroelectric Project. Final report, big game studies. Vol. II, Moose upstream
Title:
Susitna Hydroelectric Project. Final report, big game studies. Vol. II, Moose upstream
JLCTITLE245:
Final report, big game studies. Vol. II, Moose upstream / Warren B. Ballard and Jackson S. Whitman.
Personal Author:
Uniform Title:
Susitna Hydroelectric Project. Final report, big game studies. Volume II, Moose upstream
Edition:
[December 1988 ed.].
Publication Information:
Anchorage, Alaska : Alaska Dept. of Fish & Game, [1988]
Physical Description:
vi, 150 pages : illustrations, maps ; 28 cm
General Note:
Cover title.

"December 1988."

"The present study was conducted for two reasons: (1) to determine the causes of moose population decline in portions of GMU 13 since 1960, and (2) to determine the potential impact of Susitna hydroelectric development (two-dam system, Watana, and Devil Canyon impundments) on moose."--Introduction, page 4.
Bibliography Note:
Includes bibliographical references (pages 70-76).
Added Author:
Added Corporate Author:
Citation Reference Notes:
Alaska Resources Library and Information Services has assigned APA no. 4042 to this document for the Susitna Hydroelectric Project collection.
Additional Physical Form Available:
Available also in electronic format on the Internet.
Variant Title:
Final report, big game studies. Vol. 2, Moose upstream

Caption title on summary page: Susitna Hydroelectric Project. Big game studies. Vol. II, Moose, upstream : dynamics of moose populations along the middle Susitna River in relation to proposed hydroelectric development in Southcentral Alaska

Portion of title: Final report, big game studies. Vol. II, Moose upstream

Big game studies. Vol. II, Moose upstream

Moose upstream

Dynamics of moose populations along the middle Susitna River in relation to proposed hydroelectric development in Southcentral Alaska
Go to:Top of Page